LISIÈRE

Handweaving atelier · Danville, Québec · est. 2019 (fictional)

Lisière.

A one-loom workshop where the page is under tension. Threads run top to bottom; every band you pass is a pick of weft being beaten in. Pick your colours below and the cloth re-weaves itself while you watch.

  • LoomLouët 8-shaft, 100 cm
  • S sett, default24 EPI, 2/2 twill
  • SeasonWinter warps, 6–10 weeks
  • Commission line+1 819 555-0173
Macro view of linen and indigo warp threads passing through a loom reed with a madder-red weft line just beaten in

Pick I · the loom

Warp it, weft it, beat it in

Four yarns, four structures, a sett you can hear the shuttle change its mind about. Every choice re-throws the sample below, thread by thread.

Warp ends

Weft picks

Structure

Density & tension

12 EPI airy24 EPI48 EPI firm

Hand: supple, good drape

Sample 2/2 twill Warp indigo · Weft linen Sett 24 EPI · Tension working Sample width 6 in · drawn at 5.0 px/end

Pick II · the draft

Fill the squares the way a weaver reads them

Eight treadles, eight picks. Click squares to lift harnesses, watch the mini cloth rewrite itself, then throw that draft onto the big loom.

Rows: picks 1–8Cols: threads 1–8 · repeat

Draft: 2/2 twill treadling

Mini cloth · repeats the draft every 8 ends × 8 picks

Pick III · the yarns

Fibres with names, lots with numbers

Four running yarns. Everything is dyed or spun in lots you can ask about by number; ask for a swatch card and it goes out with the next warp order.

  • Wool 2/8Bluefaced Leicester type, worsted spun, 400 m per 100 g, spring clipLot w-118
  • Linen 10/2Field flax, two-week retting, wet spun, 2,400 m per 100 gLot f-047
  • Indigo vatSix dips, 120 g hank, overdyed twice for the deep groundsBain 47
  • Madder rootFour dips on alum, 80 g hank, stirred at 60 °C for two hoursBain 52
Warp threads of linen and undyed wool running through heddle eyes on a floor loom with a shuttle resting on the cloth beam

Plate II · 1,134 ends, tied on this morning

Pick IV · the ledger

Price the piece before the warp goes on

The calculator reads your loom: structure and sett feed the pick count, the pick count feeds the hours. Nothing here is a surprise at pickup.

0.5 m1.8 m3.0 m

Sett and structure come from the loom band above: 24 EPI · 2/2 twill

Warp ends (width ÷ 2.54 × EPI)1,134
Warp yarn (ends × (len + 1.4 m))3.2 m/end · C$58.06
Weft picks (len × 39.37 × EPI)1,701
Weft yarn (picks × width)C$32.66
Loom time (picks × factor ÷ 300)6.2 h × C$48
Yarn + labourC$90.72 + C$299.38
FinishingC$25.00
Estimated totalC$420

Estimate only, CAD · 300 picks/hour, C$48/h bench time · demo figures, fictional atelier

Pick V · the draw-down

What comes off the loom, at what price

Stack of folded handwoven throws in undyed wool, linen, indigo and charcoal with a madder stripe and twisted fringe edges
PieceSize (cm)StructureLead timePrice
Table runner40 × 180Plain, madder border3–4 weeksC$145
Throw130 × 1802/2 twill, wool6–8 weeksC$690
Baby blanket80 × 100Herringbone, soft wash5–7 weeksC$310
Yardage150 wide, per metreClient draft6–10 weeksC$185/m
Placemats, pair35 × 45Overshot, linen tabby3–4 weeksC$95
Overhead workbench with a hand-drawn weaving draft on graph paper, indigo and madder bobbins, tape measure and wool swatches

Plate III · the draft goes to the bench before the yarn does

Pick VI · the warp order

Commission begins with a warp, not a message

Fill the order the way we do it in the studio: how wide, how dense, how far the warp runs. The right-hand column calculates as you type.

Answer within 2 working days

Warp calculator

Warp ends800
Tie-on + waste1.2 m
Total warp7.2 m
Yarn needed≈ 1.44 kg
Weft per 10 cm20.0 g

ends = width ÷ 10 × dents/10cm × threads/dent
total = warped length + 1.2 m
kg = ends × total × g-per-m ÷ 1000

Warp order logged Ref LR-0000 Bench reply within two working days. Demo form: nothing was sent.

Atelier facts

Bench hours

Tuesday to Saturday, 9 h to 17 h. Wednesdays are warping days; the loom is silent and the reed is out.

Finishing steps

Wash cold with mild soap, full by hand, dry flat, steam press on the reverse. Fringe is twisted after the first wash, never before.

Lead times

6 to 10 weeks from a signed draft. Winter warps fill first; yardage waits for the spring reed change.

webao fictional demo